Project Overview
The project consists of replacing the overhead truss bridge on US 14 over the Kickapoo River. The new bridge will meet current standards and include a sidewalk on the north side. The project also reconstructs the approaches to the structure on both ends and adds concrete sidewalk and decorative lighting. The project begins just east of the US 61 intersection and ends just west of the WIS 131 intersection.