Project Overview
The project is needed due to the age and deterioration of the current pavement. Improvements include:
- Patching of existing concrete pavement, addressing cracking of pavement and joints
- Limited curb replacement around guardrail areas
- Maintenance on expansion joint for the bridge over Pammel Creek