Project Overview
Built in 1953 and overlaid with concrete in 1971 and 1989, the bridge has reached the end of its service life. This project includes:
- Replacing the existing bridge.
- Replacing the asphalt approaches on both sides of the structure.
- Replacing guardrail, pavement markings, and signs.