US 12, US 63 - WIS 128

St. Croix County

Project Overview

The 2020 project improvements include:

  • Removing deteriorated asphalt pavement.
  • Resurfacing US 12 with a new asphaltic surface.
  • Repairing the bridge over the Union Pacific Railroad tracks.
  • Making┬ásafety improvements to shoulders.
  • Improving culvert pipes, curb and gutter, beam guard and signing.
  • Marking the pavement.

The 2021 project continues improvements that include:

  • Reconstructing the US 12-WIS 128 intersection.

Project estimated cost: $5.75 million.