Project Overview
Crews will replace the bridge deck on the US 10 / WIS 66 bridge over I-39. Bridge work also includes relocating the sidewalk to the median area and adding concrete barrier walls to protect the median walkway area.
Other project work includes:
- Reconfiguring the intersections at Country Club Drive, the I-39 ramp terminals, and Maple Bluff Road
- Replacing pavement on US 10 / WIS 66, including intersections
- Replacing traffic signals and street lighting