Project Overview
Construction includes:
- Removing a portion of the existing pavement and overlaying the roadway with new asphalt.
- Cleaning and repairing culverts.
- Cleaning ditches.
- Replacing guardrail.
- Work will not be done at the US 10/WIS 25 North intersection, where a safety improvement project is scheduled for 2026.