Project Overview
Construction includes:
- Removing a portion of the existing pavement and repaving the approximate 14-mile stretch with new asphalt.
- Replacing culverts at Spring Creek on US 10 just west the 760th Street and 730th Street intersections west of Ellsworth.
- Replacing the existing box culverts on US 10 with bridges just east of 1040th Street and west of Cross Town Road.
- Widening paved shoulders from 3 feet to 5 feet.
- Replacing guardrail along the entire length of the project.
- Replacing pavement markings.