Project Overview
Bridge replacement. The new bridge will be approximately 3-feet higher.
WIS 27 is closed at the bridge. Traffic is detoured via WIS 8, 40, and 70.
Bridge replacement. The new bridge will be approximately 3-feet higher.
WIS 27 is closed at the bridge. Traffic is detoured via WIS 8, 40, and 70.