Back to Regions
SouthEast
- Zoo Interchange Project
- I-894 Projects
- WIS 11 (Durand Avenue)
- I-43 Rock Freeway
- I-43 URT Improvements (Capitol Dr. to Hampton Ave.)
- US 12 Improvements: WIS 50-WIS 67
- WIS 50 Reconstruction
- Brown Deer Rd and Green Bay Rd Improvements
- I-41/ I-894 Noise Wall Replacement
- I-43 NORTH-SOUTH (Glendale to Grafton)
- WIS 50 Improvements (West of I-94)
- WIS 67 Resurfacing (Williams Bay)
- WIS 145 (Fond du Lac Freeway) Improvements
- I-94 East Frontage Road Resurfacing
- WIS 50 Paddock Lake Reconstruction
- Pilgrim Rd Bridge Repairs over Capitol Drive
- WIS 57 (I-43 to County W)
This site provides extended information for construction projects currently underway throughout Wisconsin, with the same real-time conditions information found on the main 511 Wisconsin website.
For information about other plans or studies, visit the Wisconsin DOT website. Statewide real-time traveler information is available by dialing 511 or visiting the main 511 Wisconsin website.