Back to Regions
SouthEast
- Zoo Interchange Project
- Wisconn Valley Development Roads
- I-894 Adjacent Projects
- WIS 11 (Durand Avenue)
- I-43 Rock Freeway
- I-43 URT Improvements (Capitol Dr. to Hampton Ave.)
- WIS 11 Improvements - Burlington Bypass
- US 12 Improvements: WIS 50-WIS 67
- WIS 50 Reconstruction
- I-41 Improvements (Burleigh to Good Hope)
- Brown Deer Rd and Green Bay Rd Improvements
- I-41/ I-894 Noise Wall Replacement
- I-43 NORTH-SOUTH (Glendale to Grafton)
- WIS 50 Improvements (West of I-94)
- WIS 145 (Fond du Lac Freeway) Improvements
- WIS 142 Resurfacing
- Mitchell Interchange to Marquette Interchange Resurfacing (night work)
- I-94 East Frontage Road Resurfacing
- WIS 67 Resurfacing - Dousman to Eagle
- WIS 32 and WIS 165 Intersection
- Pilgrim Bridge over WIS 190 (Capitol Drive)
- WIS 33 and County I Roundabout
- I-41 (Good Hope to Waukesha County Line)
- WIS 36 Burlington Bypass (WIS 83 to WIS 20)
- US 18 (Sunset Drive)
- WIS 57 (I-43 to County W)
- WIS 181 (Wauwatosa Road)
- WIS 167 (Holy Hill Road)
This site provides extended information for construction projects currently underway throughout Wisconsin, with the same real-time conditions information found on the main 511 Wisconsin website.
For information about other plans or studies, visit the Wisconsin DOT website. Statewide real-time traveler information is available by dialing 511 or visiting the main 511 Wisconsin website.