Back to Regions
SouthEast
- Zoo Interchange Project
- I-894 Projects
- I-43 URT Improvements (Capitol Dr. to Hampton Ave.)
- I-43 NORTH-SOUTH (Glendale to Grafton)
- I-43 (Brown Street - Capitol Drive)
- WIS 20 Resurfacing (90th Street - WIS 31)
- WIS 100 Resurfacing - Shepard Ave. to WIS 32
- WIS 36 Resurfacing (Wis 100 - 51st Street)
- US 45 Reconstruction (Rawson Ave. to College Ave.)
- WIS 32 Pavement Replacement (Newberry Blvd. to Edgewood Ave.)
- WIS 145 Bridge Improvements
- WIS 181 Bridge Rehabilitation
- I-94 Resurfacing - WIS 83 to WIS 16
- WIS 38 Bridge Replacement
- 35th Street Bridge Improvements over I-94
This site provides extended information for construction projects currently underway throughout Wisconsin, with the same real-time conditions information found on the main 511 Wisconsin website.
For information about other plans or studies, visit the Wisconsin DOT website. Statewide real-time traveler information is available by dialing 511 or visiting the main 511 Wisconsin website.