Regionwide projects are designed to complete similar work types at multiple locations in multiple counties. This allows for the project to be administered and constructed efficiently, under a single contract, rather than several smaller contracts.
Cable Barrier Project
Project ID: 1050-00-77, 1160-01-78
Highways: WIS 29, I-39
Counties: Marathon, Marquette, Portage, Waushara
Overall Schedule: July 27, 2020 to November 13, 2020
Project Location:
- Abbotsford-Wausau – County E to County O
- Packwaukee-Stevens Point – Elk Road to Division Street
Traffic impacts as of November 5:
- A single lane closure along both northbound and southbound I-39 between County C and WIS 21 in Waushara county continue. This is a continuous long-term single lane closure anticipated to be complete by November 10.
Anticipated work scheduled:
- Waushara County: crews plan to finish stringing cable barrier and complete tensioning early next week.