Project Overview
Construction includes:
- Removing 1.25 inches of the existing pavement and placing 3.25 inches of new asphalt pavement
 - Replacing the decks on the bridges carrying US 63 over the south fork of Lost Creek, Lost Creek and a branch of the Rush River
 - Replacing culverts, gravel shoulders and guardrail
 - Cleaning ditches
 - Placing new pavement markings