Project Overview
Construction includes:
- Removing the existing pavement and a portion of the existing base course on US 53 and the ramps at the US 63 and WIS 70 interchanges.
- Placing a new base aggregate layer for drainage.
- Replacing the pavement on US 53.
- Replacing the pavement on the interchange ramps at US 63 and WIS 70.
- Replacing the pavement on WIS 70 between the ramp terminals.
- Rebuilding existing intersection approaches.
- Rehabilitating the bridges on US 53 over the Yellow River, US 53 over US 63 and WIS 70 over US 53 with concrete deck overlays and other repairs.