US 63, WIS 48 West to Charrie Lane

Barron County

Project Overview

Construction includes:

  • Removing 3.25 inches of the existing pavement and placing 3.25 inches of new asphalt pavement
  • Closing access to the roadway at various locations to improve safety
  • Upgrading pedestrian curb ramps to current Americans With Disabilities Act standards
  • Repairing or replacing curb, gutter and sidewalk
  • Repairing sanitary sewer manholes and storm water inlets as needed
  • Extending the two-way left-turn lane pavement markings between 3rd and 5th avenues
  • Replacing pavement markings and signage