Project Overview
Construction includes:
- Removing and replacing the bridge
- Widening the east side of US 63 north of the bridge and shifting the Spruce Street intersection to the east
- Converting the current northbound US 63 lane into a left-turn lane for southbound US 63 traffic to turn onto Spruce
- Vehicles traveling south on US 63 frequently encounter stopped vehicles waiting to turn left onto Spruce Street, resulting in a high frequency of rear-end crashes.
- Constructing a new northbound US 63 lane east of the new turn lane.
- Replacing the culvert under Spruce Street
- Replacing pavement markings and signage