Winter Street, US 53 to Susquehanna Avenue, and Susquehanna Avenue, Winter Street to Belknap Street

Douglas County

Project Overview

Construction includes:

  • Removing a portion of existing pavement on Winter Street and Susquehanna Avenue and placing a new layer of asphalt over the roadways
  • Adding a left-turn lane for northbound traffic on Susquehanna Avenue at the on-ramp to westbound US 2
  • Adding pavement markings to delineate additional turn lanes, as room allows, on the corridor
  • Adding temporary traffic signals on Winter Street at Grand Avenue
    • These signals will be removed after construction and restored to the pre-construction condition when the new Blatnik Bridge reopens. 
  • Adding stop signs on Winter Street at Catlin Avenue and adjusting other stop signs at intersections along Winter Street
  • Making pavement marking modifications along Belknap Street
  • Removing left-turn lanes along Belknap at Banks and Ogden avenues

This work is part of the Blatnik Bridge replacement project. For more on the overall bridge project, visit its website.