Construction includes:
- Pulverizing and relaying the existing pavement structure and placing a new layer of asphalt over it
- The driving lane widths will be narrowed to 11 feet in each direction to accommodate the multi-use path and terrace on the west side.
- Pouring new curb and gutter along the west side and installing an asphalt multi-use path
- Installing Americans With Disabilities Act-compliant sidewalk curb ramps at all crossings within the project limits
- Updating the storm sewer system to accommodate new roadway layout
- Installing new water main and laterals from Summer Street to Laurel Avenue