Project Overview
Construction includes:
- Replacing pavement with new concrete from Lanquist Street to Southshore Drive
- Replacing storm sewer and expanding its capacity from Lanquist to Works Progress Street
- Resurfacing the roadway from Southshore Drive to WIS 70 East
- Reviewing and revising access points
- Improving turning movements in all quadrants at the WIS 35 and WIS 70/County B intersection in the city of Siren
- Replacing traffic signals
- Replacing curb ramps
- Removing extra lanes from Park Street to Northshore Drive to reduce flooding potential