Construction includes:
- Replacing the concrete bridge deck
- Making concrete surface repairs at the abutments and girders
- Replacing the steel bearings at the east abutment
- Replacing the east abutment expansion joint
- Replacing the southwest wing wall top
- Replacing concrete pavement approach slabs and about 100 feet of roadway approaches