Project Overview
Construction includes:
- Extending an existing noise wall on the west side of WIS 35 south of the existing noise wall between the highway and Heritage Boulevard
- Adding a noise wall on the east side of WIS 35 southwest of Meadows Park and northwest of the Canary Way cul-de-sac
- Adding a noise wall on the east side of WIS 35 between the highway and Meadowlark Drive and Meadowlark Lane