Overview Schedule Traffic Impacts (current) Map (current) Contact Us (current) Traffic Impacts During construction: US 12 will be closed to through traffic. Through traffic will be detoured via WIS 65 and I-94. Local traffic would be maintained on the east and west sides of the bridge.