Project Overview
The project includes:
- Milling and resurfacing the existing pavement with new asphalt from Short Road to the Fall Creek Bridge
- Widening paved shoulders from 3 feet to 5 feet
- Installing shoulder and centerline rumble strips to enhance driver safety
- Repairing or replacing aging culverts and cattle passes
- Upgrading guardrail throughout the project
- Improving drainage by grading ditches at key locations:
- South of US 12 near Schultz Road
- South of US 12 west of Oak Knoll Road
- West of the Fall Creek Bridge (approximately 500 feet)
- Installing new pavement markings throughout the corrdior
- Clearing trees from a 500-foot segment between Voight and Oak Knoll roads after an environmental clearance window opens after Oct. 31