US 12, Industrial Drive to Fall Creek Bridge

Eau Claire County 

Project Overview

The project includes:

  • Milling and resurfacing the existing pavement with new asphalt from Short Road to the Fall Creek Bridge
  • Widening paved shoulders from 3 feet to 5 feet
  • Installing shoulder and centerline rumble strips to enhance driver safety
  • Repairing or replacing aging culverts and cattle passes
  • Upgrading guardrail throughout the project
  • Improving drainage by grading ditches at key locations:
    • South of US 12 near Schultz Road
    • South of US 12 west of Oak Knoll Road
    • West of the Fall Creek Bridge (approximately 500 feet)
  • Installing new pavement markings throughout the corrdior
  • Clearing trees from a 500-foot segment between Voight and Oak Knoll roads after an environmental clearance window opens after Oct. 31