Skip to content
Construction includes:
- Removing and replacing both bridges.
- Constructing a single-lane bypass around the Mill Creek Bridge to carry traffic during construction.
- Replacing the pavement on both sides of each structure.
- Replacing guardrail.
- Replacing pavement markings.