WIS 137, US 2 to WIS 112

Bayfield and Ashland Counties

Project Overview

Construction includes:

  • Removing 2 1/4 inches of existing pavement and placing 3 1/4 inches of new asphalt pavement.
  • Grading shoulders to match the new edge of the asphalt pavement.
  • Repairing, replacing or cleaning culvert pipes.
  • Replacing an end terminal on a section of guardrail and adjusting the height on another segment.
  • Placing new pavement markings.