Lansing Bridge Project

Mississippi River, Crawford County

Project Overview

Visit the Iowa DOT website for more information.

 

Why does the current bridge need to be replaced?

A lot of data has been collected related to the current structure. Here are just a few conclusions from the analysis of this data:
• Structural condition – The current bridge rates as low for its structure. This limits commercial traffic and is impacting freight movement in the region.
• Geometry – The tight turn where Iowa 9 intersects in Lansing makes it difficult for truck traffic, also impacting freight movement in the region.
• Safety – The deck is narrow at only 21 feet and has no shoulders. This gives no room for motorists with mechanical trouble to pull over safely. Any crash or other incident will likely close the bridge completely.
• Ride – The old bridge has a steel grate deck that provides a very rough ride. The steel grates were difficult for our winter maintenance crews to remove snow and ice.
• Navigation – The 650-foot width of the navigation channel is problematic for barges.

 

What can you expect from the new bridge?

In addition to collecting a lot of data about the current bridge, we’ve also held several meetings and listened to area residents as they told us what is important to them about the old bridge and what they expect with the new one.

• Design – The existing bridge is a beloved structure in the region. The new bridge was thoughtfully designed to mimic the look of the existing bridge.
• Geometry – The Iowa 9 intersection in Lansing will be upgraded to allow for safer truck travel.
• Safety – The new bridge will have wider lanes and eight-foot-wide shoulders (40 feet total), greatly increasing safety.
• Ride – The new bridge will have a smooth, concrete deck that will protect the superstructure from winter maintenance treatments.
• Navigation – The navigation channel will be increased to 750 feet, making it easier for barges to get through the area.