WIS 93, I-94 Bridges

Eau Claire County

Project Overview

Construction on the southbound bridge, B-18-34, includes:

  • Replacing the bridge joints.
  • Making repairs to the bridge deck and diaphragm.
  • Overlaying the bridge deck with concrete.
  • Replacing the concrete approaches on both ends of the structure.
  • Completing fiber wrapping of bridge piers.

Construction on the northbound bridge, B-18-119, includes:

  • Replacing both north wing walls.
  • Making repairs to the bridge deck and sidewalk.
  • Replacing the concrete approaches on both ends of the structure.
  • Completing fiber wrapping of bridge piers.