Project Overview
This project will reconstruct and widen WIS 128 within a half mile of the interchange. Our proposed project improvements will also include:
- Replacement of the WIS 128 bridge over 1-94 with one structure to accommodate both northbound and southbound traffic.
- Reconstruction of the I-94 ramp terminal intersections with WIS 128 with the installation of roundabouts at each end.
- Construction of a park and ride lot.