Project Overview
Construction in 2024 includes:
- Replacing the existing westbound I-94 concrete pavement.
- Replacing the westbound I-94/US 10 interchange on- and off-ramp connections.
- Constructing right-turn lanes on US 10 at the I-94 on-ramps.
- Completing a polymer chip seal on the US 10 bridge over I-94.