Project Overview
The Wisconsin Department of Transportation (WisDOT) will improve 1.26 miles of I-94. The project starts at County Y and ends at WIS 26.
Improvements include:
- Concrete surface repair and spot replacement of the existing concrete pavement of I-94, the ramps, and pavement between the ramps
- Existing shoulder pavement will be milled and overlaid with new asphalt pavement or replaced as needed
- Existing asphalt pavement at the park and ride on North Watertown Street will be milled and overlaid
- Existing curb ramps adjacent to the park and ride driveway, bus stop, and along the west side of North Watertown Street will be upgraded to meet Americans with Disabilities Act (ADA) standards
- Repairs will be made to bridge structures