Traffic impacts
Stage 1
- Full closure from Avon Rd. to River Rd. (7/18/22 – 9/30/22)
- Single lane closures on WIS 27 NB & SB from Theisen’s to Avon Rd.
Stage 2
- Flagging operation from Icon Ave to Theisen’s
Stage 3
- Full nighttime closures to complete Exit 25 ramps (~ 2 nights per direction)
Detour
WIS 27 and I-90 traffic will be detoured to Exit 28 (WIS 16 interchange) to navigate around full closure from Avon Rd. to River Rd.