Project Overview
The project will apply a concrete overlay on both bridge decks and includes a pavement replacement of the roadway approaches and the areas between the bridges. Guardrail will be reconstructed with the project and there will be associated grading. There will also be secondary work on the structures including concrete repairs on the columns, abutments, and parapets.