Overall Project Description:
- Remove all (5-7 inches) existing asphalt pavement
- Patch remaining concrete pavement as neede and place new asphalt pavement (5-7 inches)
- Uneven lanes at times
- Pavement replacement at the following local road overhead bridges and add barrier wall
- County C
- County V
- County O
- Ramp closure – on/off at County V (Beechnut Dr) in Hancock – three weekdays
- U-turn detour on I-39 with closure
- Update guardrail
- Place shoulder gravel
- Shoulder rumble strips
- New pavement marking