I-39, County O to the Portage County Line

Waushara County

Project Overview

Page last updated: April 15, 2022

Overall Project Description:

  • Remove all (5-7 inches) existing asphalt pavement
  • Patch remaining concrete pavement as neede and place new asphalt pavement (5-7 inches)
  • Uneven lanes at times
  • Pavement replacement at the following local road overhead bridges and add barrier wall
    • County C
    • County V
    • County O
  • Ramp closure – on/off at County V (Beechnut Dr) in Hancock – three weekdays
    • U-turn detour on I-39 with closure
  • Update guardrail
  • Place shoulder gravel
  • Shoulder rumble strips
  • New pavement marking