I-39 Bridges in Plover

I-39/Portage County B interchange and I-39 bridges over the railroad tracks north of the interchange

Project Overview

In addition to replacing and resurfacing bridge decks, the project also includes:

  • Building permanent crossovers south of the County B interchange and north of the bridges over the railroad tracks.
  • Replacing guardrail.
  • Making concrete pavement joint repairs.
  • Replacing vehicle detection loops for traffic signals.
  • Repairing existing culverts.
  • Enhancing the existing over-height detection system for vehicles on the I-39 ramps or on County B planning to pass under I-39.
  • Resurfacing of the I-39 southbound off-ramp to County B.