Schedule
Construction begins: February 6, 2023
Anticipated completion: Spring 2024
Traffic impacts/detours
Stage 3A
- Close newly constructed SB off ramp and open existing SB off loop ramp to construct the ramp to SB roundabout connection.
Stage 3B/C
- Work on South half of Roundabouts. No ramp closures or impacts. New SB Off ramp is reopened.
Stage 3D
- I-39 SB on-ramp closed with signed detour posted.
- WIS 60 E / WIS 60 W on-ramp to I-39 SB detour utilizes I-39 NB to Exit 115 (County CS) to I-39 SB.
- WIS 60 maintains two-way traffic but may experience traffic slowdowns/rolling closures.
Winter Shutdown: 2023/2024
- All ramp motions are functional at the WIS 60 interchange.
- WIS 60 open, two-way traffic.
Stage 4
- All I-39 SB traffic is shifted over to the I-39 NB lanes and placed in a bi-directional configuration, with two 11-foot lanes in each direction separated with concrete barrier wall.
- WIS 60 maintains two-way traffic but may experience traffic slowdowns/rolling closures.
Stage 5
- Lane closures along I-39 both NB and SB lanes, (no weekend closures).