Project Overview
Construction includes:
- Placing a 1.5-inch concrete overlay over the bridge deck
- Repairing the concrete sidewalk, bridge piers and parapet
- Making joint repairs
- Cleaning drainage grates
- Painting bridge girders
- Milling 2 inches of the existing asphalt pavement on either side of the structure and paving 2 inches of hot-mix asphalt over the roadway
- Replacing curb, gutter and sidewalk
- Restoring the landscape around the construction site