WIS 76 & School Road - Outagamie County

 Roundabout Construction

Project Overview

PROJECT CONSTRUCTION STARTS MONDAY, APRIL 15, 2024.

Location and limits

Project ID 6430-20-00 is located at the intersection of WIS 76/School Road, 0.8 miles south of WIS 15. The intersection is currently a two-way stop control intersection with two-lane rural roads on all four legs of the intersection. A multi-use trail crosses the west leg of School Road and ​​​runs south within the right-of-way (ROW) on the west side of the south leg of WIS 76.

Purpose and n​eed

The purpose of the project is to address safety and level of service issues at the WIS 76 and School Road intersection. The project has been approved for a Highway Safety Improvement Program (HSIP) grant from the Federal Highway Administration (FHWA). During design, a single-lane roundabout was selected as the preferred alternative.

Proposed improvements

Improvements include:

  • Installation of a single lane roundabout
  • New pavement structure
  • Lighting
  • Culvert/storm sewer replacement
  • Curb and gutter
  • Signing and pavement marking
  • Pedestrian accommodations at the intersection
  • Sidewalk on School Road east of WIS 76

Project schedule

  • Construction is scheduled to begin in early April 2024.
  • Construction is tentatively scheduled to finish in August 2024.

Traffic impacts

The intersection will be closed and detoured when construction begins in April 15, 2024.

Local access to property owners and businesses within project limits will be maintained throughout the project.

  • Access to the town of Greenville trail will be maintained throughout construction.

In This Together program for businesses

WisDOT’s In This Together program is offered to business and community leaders as an idea source as they plan for road construction in their area. On the In This Together website, businesses can find a specially designed Business Coordination Guide for businesses to succeed during a highway construction project.

Temporary Business Signing

During construction, temporary signing for business will be available. While signing and other marketing/advertising during the construction is up to the business.

Contacts

An onsite Construction Leader will be available throughout construction. Please contact the construction leader with construction-related questions.

Keith Nikolay
Onsite Construction Leader
(920) 883-6409
knikolay@coleman-engineering.com.

Please contact the WisDOT project manager with any other questions.
Kurt Vogel, P.E.
WisDOT Project Manager
(920)362-1732
Kurt.vogel@dot.wi.gov