Project Details
This WisDOT project will make improvements to approximately 7.8 miles of WIS 67, between US 12 and WIS 59, in Waukesha and Walworth Counties.
Improvements:
- Resurface WIS 67 within project limits
- Mill off 2 inches of existing pavement and replace with 2 inches of new asphalt
- Replace beam guard
- Concrete Curb and Gutter
- Replace curb ramps in the village of Eagle to meet ADA standards
- New pavement marking and signing
Traffic Impacts:
Access to local businesses and residences will be maintained.
WIS 67 will be closed to through traffic between WIS 59 and US 12. Detour will be posted utilizing US 12 and WIS 59. (see map tab for detour map)
Schedule:
Construction is scheduled to begin in April 2026 and be completed by summer 2026. All work is weather dependent and subject to change.