Project Overview
The construction website details the scope, schedule, and traffic impacts for THREE projects in Outagamie County that began in 2024 and will end in late 2025.
Work resumes April 2025. WIS 54 full closure begins June 2025.
NOTICE OF PUBLIC MEETING
Please join the Wisconsin Department of Transportation (WisDOT) Northeast Region for a live, online construction information meeting to show 2025 construction on WIS 54 from County S to Park Avenue and on WIS 47 from County B to North County Line. The intent of this meeting is to discuss the project schedule of operations including vehicular and pedestrian access during construction operations. This meeting will be held via Microsoft Teams. Project staff will share maps, displays, and exhibits via a live presentation. You can ask questions or provide comment to the project staff at the end of the live presentation. You can also listen to the project presentation via audio-only if you prefer.
WIS 54/47 Virtual Construction Information Meeting
- When: 5 p.m., Wednesday, April 2, 2025
- For full video and audio: Access the meeting via computer or mobile device by going to the WIS 54 and WIS 47 Project Construction website and click the “Go to Meeting” link at the time of the meeting.
- For audio-only: Call into the meeting via phone. You will hear the presentation and be able to ask questions.
- Conference Call Number: +1 (608) 571-2209, Phone Conference ID: 966135374#
PROJECTS AND LOCATIONS
- WIS 54 Resurfacing: 8.8 miles of WIS 54 between the town of Liberty just west of House Road and Park Avenue in the village of Shiocton, Outagamie County
- WIS 47 Urban Resurfacing: 0.5 miles on WIS 47 from County B to Burdick Street in the village of Black Creek, Outagamie County.
- WIS 47 Rural Resurfacing: 8.1 miles of WIS 47 from Burdick Street in the village of Black Creek to the north Outagamie County line in the town of Cicero, Outagamie County.
WIS 54 RESURFACING
This is a resurfacing-level improvement with replacement of two structures and various pipe culverts. Box culvert structure replacement locations are noted on the exhibit below by the structure number on the exhibit. Culvert replacements are noted on the detour route maps. Project improvements for WIS 54 include:
- Mill 4″ and overlay 4″ of the existing asphalt pavement
- Replacement of box culvert (C-44-1020) in Shiocton
- Replacement of a wingwall on box culvert (C-44-0053) in Liberty
- Replacement of various culvert pipes
- Widen paved shoulders from 3’ to 5’
- Spot replacement of storm sewer
- Replace various guardrail
- Spot repair of curb and gutter as needed
- Addition of centerline and shoulder rumble strips
- Replacement of curb ramps within the village of Shiocton
- Pavement marking
WIS 54 schedule and traffic impacts for 2025
Construction resumes on April 7, 2025, with road closures beginning in May 2025. Work is expected to finish in late August 2025. Replacement of culvert C-44-1020 in Shiocton is expected to take approximately 60 days and will require a full clouse.
- WIS 54 will be closed to through traffic.
- This 60-day closure is expected to begin mid-June 2025.
- Access to businesses and properties in the detoured portion of the highway will be maintained.
- Detour: Traffic will be directed to use WIS 76, County S and County M.
WIS 54 will remain open during resurfacing using single lane closures and flagging operations.
WIS 187 two-day closure
- WIS 187 at WIS 54 will be closed to through traffic for two-days in late April or early May 2025. No detour will be provided.
WIS 47 URBAN RESURFACING
Most of this work finished in 2024. Urban resurfacing of WIS 47 from County B to Burdick Street in the village of Black Creek in Outagamie County. Improvements include:
- Mill/overlay of the existing pavement
- Replacement of curb ramps for Americans with Disabilities Act (ADA) compliance
- Miscellaneous storm sewer repair
- Pavement markings
WIS 47 urban schedule and traffic impacts
Construction began September 2024 with a 30-day closure. This closure is complete. Work continues in 2025 with no full closures.
Temporary business signing
If business access is impacted by a closure or detour, temporary business signing may be placed by filling out a WisDOT business signing permit. All temporary business signing needs approval via the permit before placement to ensure it is in a safe location and does not pose a visual distraction or traffic hazard. The temporary business signing permit is free. Costs associated with creating the temporary sign are the responsibility of the business.
- Click the below link for instructions and a link to a fillable-form WORD application for the permit.
- Please email or mail the free permit to any of the contacts below.
For more information regarding temporary signing, plus tips and tools for businesses impacted by highway construction, please visit WisDOT’s In This Together business resource website.
WIS 47 RURAL RESURFACING
This is a resurfacing-level improvement. Improvements include:
- Mill/overlay of the existing asphalt pavement
- Guardrail replacements
- Culvert replacement
- Shoulder aggregate
- Pavement markings
- Curb ramp improvement
- View design display in map (Improvement locations noted in map)
WIS 47 Rural Project Traffic Impacts
WIS 47 will be open to traffic during construction. Traffic control in the form of flagging operations will be used to close one lane of WIS 47 at a time as necessary.
Project contacts
A construction project leader will be onsite during construction. For all construction-related question, please contact the onsite project leader. For all other questions, please contact the WisDOT Project Manager below.
WIS 54 and WIS 47 construction project leader and onsite construction field office
Mick Magalski
Phone: (920) 427-3133
Onsite field office: W7841 Smith Street, Shiocton
WisDOT Project Manager
Jesse Hansen, P.E.
WisDOT Project Manager WisDOT – Northeast Region
944 Vanderperren Way Green Bay, WI 54304-5344
Phone: (920) 492-5630
jesse.hansen@dot.wi.gov