Project Overview
The purpose of this project is to replace the 81 year old truss bridge, over the Wolf River, with a new concrete girder span bridge that meets current design and safety standards. Other improvements include:
- Replacing the deteriorating pavement leading up to the bridge
- Replacing the guardrail
- Installing new pavement markings and signs
- Improving safety by removing the Old 55 Road connection to WIS 52