WIS 50 Resurfacing (Lake Lawn Drive to WIS 67)

Walworth County

Project Details

This WisDOT project will make various improvements to approximately 3.7 miles of WIS 50, between Lake Lawn Drive and WIS 67, in Walworth County. This project will also make improvements to a small section of WIS 67, between Glenwood Drive and WIS 50.

Improvements include:

  • Remove and replace asphalt pavement along WIS 50 within project limits (Lake Lawn Drive to WIS 67)
  • Replace pavement on WIS 67  between Glenwood Drive and WIS 50.
  • New pedestrian curb ramps at Bailey Road and WIS 67
  • New sidewalk and pedestrian accommodations at WIS 67 and Bailey Road intersection.
  • Upgrade traffic signals at WIS 67
  • Replace traffic signals at Town Hall Road / South Shore Drive
  • Storm sewer cleaning and repair
  • Replace guardrail on bridge over Delavan Lake Inlet
  • New pavement markings and signing

Traffic Impacts:

WIS 50 will be closed to through traffic within the project limits. WIS 50 will remain open for access to local businesses and other destinations within the work zone.

Schedule:

This project is scheduled to begin in early September and be completed by mid-fall 2025. All work is weather dependent and subject to change.