WIS 22, Montello

Main Street and Montello Street

Project overview

Remaining work for 2020 includes:

  • Crews will remove the temporary concrete barrier wall along the river and then get set up to pour the permanent barrier wall followed by backfilling behind the new wall and some concrete sidewalk work.