US 10, WIS 29/35 to South Junction of US 63

Pierce County 

Project Overview

Construction includes:

  • Removing a portion of the existing pavement and repaving the approximate 14-mile stretch with new asphalt.
  • Replacing culverts at Spring Creek on US 10 just west the 760th Street and 730th Street intersections west of Ellsworth.
  • Replacing the existing box culverts on US 10 with bridges just east of 1040th Street and west of Cross Town Road.
  • Widening paved shoulders from 3 feet to 5 feet.
  • Replacing guardrail along the entire length of the project.
  • Replacing pavement markings.