Zoo Interchange Project

Latest Traffic Report: 10/19/17

List of all scheduled closures and restrictions on the Zoo Interchange Project from October 19 – October 29:

Thursday (10/19)

Zoo Interchange Project

– there will be a full closure overnight I-41 SB at Bluemound Rd for a traffic switch.   *contingency is Friday 10/20

– there will be a full closure overnight I-41/894 NB at Greenfield Ave for traffic switch preparation.

– the Zoo Int W-S system ramp will be closed overnight for a traffic switch.   *contingency is Friday 10/20

 

Valley Bridges/Marquette Interchange Project

– a lane will be closed overnight on the Marquette Int W-N system ramp for painting.   *contingency is Friday 10/20

– a lane will be closed overnight I-794 EB at Plankinton Ave for Southeast Region sign structure work.

– a lane will be closed overnight I-794 WB at 5th St for Southeast Region sign structure work.

 

Ozaukee Co Crack Seal Project

– a lane will be closed overnight I-43 NB from Falls Rd to Ulao Pkwy for crack sealing.

 

Friday (10/20)

Zoo Interchange Project

– there will be a long-term full closure 6am through late November 2017 120th St NB/SB at Fairview Ave for roadway reconstruction.

– there will be a long-term full closure 6am through late November 2017 Fairview Ave EB/WB from 120th St to Curtis Rd for roadway reconstruction.

– a lane will be closed during the day Capitol Dr EB/WB at 118th St for signal removal.

– a lane will be closed during the day Greenfield Ave EB from 97th St to 96th St for Q3 pavement restoration.

– lanes will be closed 11:59pm through 10/22 HWY 100 NB/SB from Dakota St to National Ave for City of West Allis utility work and pavement restoration.

– lanes will be closed overnight I-41/894 SB from Lincoln Ave to Oklahoma Ave for pavement repair.

– there will be a full closure overnight I-41/894 NB at National Ave for a traffic switch.   *contingency is Monday 10/23

– the Zoo Int W-N system ramp will be closed overnight for a traffic switch.   *contingency is Monday 10/23

– the Zoo Int N-E system ramp will be closed overnight for sign structure work.

– the Zoo Int N-W system ramp will be closed overnight for sign structure work.

 

Nor-X-Way Channel Project

– there will be a 15 minute rolling lane closure between 4am and 5am I-41 NB/SB at Main St for pavement repair.

 

Ozaukee Co Crack Seal Project

– a lane will be closed overnight I-43 SB from Ulao Pkwy to Falls Rd for crack sealing.

 

Saturday (10/21)

Zoo Interchange Project

– lanes will be closed 10/20 through 10/22 HWY 100 NB/SB from Dakota St to National Ave for City of West Allis utility work and pavement restoration.

– lanes will be closed in the morning I-94 EB/WB from Mitchell Blvd to Hawley Rd for WisDOT bridge inspection.

– the Stadium Int N-W system ramp will be closed in the morning for WisDOT bridge inspection.

– the Stadium Int S-W system ramp will be closed in the morning for WisDOT bridge inspection.

 

Sunday (10/22)

Zoo Interchange Project

– lanes will be closed 10/20 through 11:59pm HWY 100 NB/SB from Dakota St to National Ave for City of West Allis utility work and pavement restoration.

 

Monday (10/23)

Zoo Interchange Project

– a lane and a parking lane will be closed 5am through 10/26 Greenfield Ave EB from 98th St to 96th St for City of West Allis pavement restoration.

– a lane will be closed during the day HWY 100 NB from Greenfield Ave to Washington St for WisDOT driveway work.

– lanes will be closed overnight I-94 EB from Elm Grove Rd to Underwood Creek for riprap endwall repair.   *contingency is Tuesday 10/24

– there will be a full closure overnight I-41 SB at Hampton Ave for DMS installation and Milwaukee Co Maintenance pavement repair.

– there will be a full closure overnight I-94 WB at 84th St for pavement marking.   *contingency is Tuesday 10/24

– the Zoo Int S-E system ramp will be closed overnight for pavement marking.   *contingency is Tuesday 10/24

 

Tuesday (10/24)

Zoo Interchange Project

– a lane and a parking lane will be closed 10/23 through 10/26 Greenfield Ave EB from 98th St to 96th St for City of West Allis pavement restoration.

– a lane will be closed during the day HWY 100 NB from Greenfield Ave to Washington St for WisDOT driveway work.

– there will be a full closure overnight I-41 SB at Hampton Ave for DMS installation.

 

Wednesday (10/25)

Zoo Interchange Project

– a lane and a parking lane will be closed 10/23 through 10/26 Greenfield Ave EB from 98th St to 96th St for City of West Allis pavement restoration.

– a lane will be closed during the day HWY 100 NB from Greenfield Ave to Washington St for WisDOT driveway work.

– there will be a full closure overnight I-41 SB at Hampton Ave for DMS installation.

– there will be a full closure overnight I-94 WB at the Zoo Interchange for traffic switch preparation.   *contingency is Thursday 10/26

– the Zoo Int S-W system ramp will be closed overnight for traffic switch preparation.   *contingency is Thursday 10/26

– the Zoo Int N-E system ramp will be closed overnight for traffic switch preparation.   *contingency is Thursday 10/26

– the Zoo Int N-W system ramp will be closed overnight for traffic switch preparation.   *contingency is Thursday 10/26

 

Ryan Road Interchange Project

– a lane will be closed long-term 5am through mid-November 2017 Ryan Rd EB/WB from 13th St to 22nd St for temporary signal work.

 

Thursday (10/26)

Zoo Interchange Project

– a lane and a parking lane will be closed 10/23 through 5am Greenfield Ave EB from 98th St to 96th St for City of West Allis pavement restoration.

– a lane will be closed during the day HWY 100 NB from Greenfield Ave to Washington St for WisDOT driveway work.

 

– there will be a full closure overnight I-94 WB at the Zoo Interchange for a traffic switch.   *contingency is Friday 10/27

– the Zoo Int S-W system ramp will be closed overnight for a traffic switch.   *contingency is Friday 10/27

– the Zoo Int N-E system ramp will be closed overnight for a traffic switch.   *contingency is Friday 10/27

– the Zoo Int N-W system ramp will be closed overnight for a traffic switch.   *contingency is Friday 10/27

 

Friday (10/27)

Zoo Interchange Project

– the HWY 100 entrance ramp to I-94 WB reopens to traffic by 6am.

– the I-94 WB exit ramp to HWY 100 reopens to traffic by 6am.

– 100th St NB/SB from Orchard St to Maple St reopens to traffic by 6pm.

– a lane will be closed during the day HWY 100 NB from Greenfield Ave to Washington St for WisDOT driveway work.

– lanes will be closed overnight I-41 SB at Hampton Ave for DMS installation.

 

Saturday (10/28)

Zoo Interchange Project

– only long-term lane closures in effect.

 

Sunday (10/29)

Zoo Interchange Project

– only long-term lane closures in effect.

 

Long-Term Closures

Zoo Interchange Project

– there will be a full closure from 100th St NB/SB from Orchard St to Maple St through 10/27 for roadway work.

– there will be a full closure of the HWY 100 entrance ramp to I-94 WB through 10/27 for ramp reconstruction.

– there will be a full closure of the I-94 WB exit ramp to HWY 100 through 10/27 for ramp reconstruction.

– a lane will be closed on Curtis Rd NB/SB under I-94 through Fall 2017 for roadway construction.

– a lane will be closed on HWY 100 NB/SB at Beloit Rd through 11/18 for utility work.

– a lane will be closed Watertown Plank Rd EB/WB from HWY 100 to 115th St through mid-November 2017 for bridge reconstruction.

– a left-turn lane will be closed HWY 100 NB at Watertown Plank Rd through mid-November 2017 for bridge reconstruction.

– there will be a full closure of the I-94 EB exit ramp to 84th St (from I-94 EB and I-41 SB) through late November 2017 for roadway reconstruction.

– there will be a long-term full closure through late November 2017 120th St NB/SB at Fairview Ave for roadway reconstruction.

– there will be a long-term full closure through late November 2017 Fairview Ave EB/WB from 120th St to Curtis Rd for roadway reconstruction.

– there will be a full closure of the Greenfield Ave entrance ramp to I-41/894 NB (to I-41 NB and I-94 WB) through late 2017 for ramp reconstruction.

– there will be a full closure of the 84th St entrance ramp to I-94 WB (to I-94 WB) through late 2017 for roadway reconstruction.

– there will be a full closure of the Deer Creek Trail/Oak Leaf Trail NB/SB at I-94 through late 2017 for bridge demolition (one trail will remain open at all times).

– there will be a full closure of the National Ave entrance ramp to I-41/894 SB through late 2017 for roadway reconstruction.

– there will be a full closure of the National Ave entrance ramp to I-41/894 NB through late 2017 for roadway reconstruction.

– there will be a full closure of the I-41 NB exit ramp to Bluemound Rd through late April 2018 for ramp reconstruction.

– there will be a full closure of the I-41/894 SB exit ramp to Greenfield Ave through early Summer 2018 for roadway construction.

– there will be a full closure of the I-41/894 SB exit ramp to Lincoln Ave through early Summer 2018 for roadway construction.

– there will be a full closure of the Zoo Int E-S system ramp through June 2018 for ramp reconstruction.

– there will be a full closure of Schlinger Ave EB/WB under I-41/894 through late Summer 2018 for project construction.

– the Hank Aaron State Trail will be closed to pedestrians from 94th Pl to Oak Leaf Trail through late Summer 2018 for project construction.

 

Nor-X-Way Channel Project

– there will be a full closure of the I-41 NB exit ramp to Main St EB through mid-November 2017 for roadway reconstruction.

– there will be a full closure of the Main St entrance ramp to I-41 SB through mid-November 2017 for roadway reconstruction.

– there will be a full closure of the I-41 SB exit ramp to Main St through mid-November 2017 for roadway reconstruction.

 

Ryan Road Interchange Project

– a lane will be closed long-term 10/25 through mid-November 2017 Ryan Rd EB/WB from 13th St to 22nd St for temporary signal work.