Zoo Interchange Project

Latest Traffic Report: 8/17/17

List of all scheduled closures and restrictions on the Zoo Interchange Project from August 17 – August 20:

Thursday (8/17)
Zoo Interchange Project
– there will be a full closure overnight 118th St NB/SB at Capitol Dr for patch work.
– a lane will be closed overnight Capitol Dr frontage road WB at 118th St for patch work.
– a lane will be closed overnight STH 100 NB/SB at Wisconsin Ave, at Potter Rd, and at Watertown Plank Rd for Wavetronix installation.
– a lane will be closed overnight Bluemound Rd EB/WB at Underwood Creek Pkwy, at 121st St, at 112th St and at 92nd St for Wavetronix installation.
– there will be a moving lane closure overnight I-41 NB/SB from Watertown Plank Rd to Burleigh St for pavement markings.
– there will be a full closure overnight I-94 EB at Moorland Rd for bridge stripping and staining.
 
Highway Lighting Maintenance Project
– a lane will be closed during the day I-43 NB at Brown Deer Rd for underdeck lighting work.
 
HFST and Overlays Project
– lanes will be closed overnight I-94 WB at the Stadium Interchange for surface sealer and pavement markings.
– the Stadium Int E-S system ramp will be closed overnight for surface sealer and pavement markings.
 
Valley Bridges/ Marquette Interchange Project
– a lane will be closed overnight Michigan St EB at 10th St for deck preparation.
– there will be a full closure overnight Michigan St WB at 10th St for deck preparation.
– the Marquette Int N-E system ramp will be closed overnight for milling.
 
Friday (8/18)
Zoo Interchange Project
– a lane will be closed overnight STH 100 NB/SB at Wisconsin Ave, Potter Rd, and at Watertown Plank Rd for Wavetronix installation.
– there will be a moving lane closure overnight I-41 NB/SB from Watertown Plank Rd to Burleigh St for pavement markings.
– there is a full closure overnight I-41 SB at Bluemound Rd for decking.
 
HFST and Overlays Project
– lanes will be closed overnight I-41 NB/SB at Burleigh St for HFST work.
 
Valley Bridges/ Marquette Interchange Project
– the Marquette Int N-E system ramp will be closed overnight for milling.
 
Saturday (8/19)
Zoo Interchange Project
– a lane will be closed overnight STH 100 NB/SB at Wisconsin Ave, Potter Rd, and at Watertown Plank Rd for Wavetronix installation.
– a lane will be closed overnight Bluemound Rd EB/WB at Underwood Creek Pkwy, at 121st St, at 112th St and at 92nd St for Wavetronix installation.
– there will be a moving lane closure overnight I-41 NB/SB from Watertown Plank Rd to Burleigh St for pavement markings.
 
HFST and Overlays Project
– lanes will be closed overnight I-43/94 SB from the Marquette Interchange to National Ave for pavement markings.
– the Marquette Int W-S system ramp will be closed overnight for pavement markings.
– the Marquette Int E-S system ramp will be closed overnight for pavement markings.
 
Sunday (8/20)
Zoo Interchange Project
– a lane will be closed during the day STH 100 NB at I-41 for utility work.
– a lane will be closed overnight STH 100 NB/SB at Wisconsin Ave, Potter Rd, and at Watertown Plank Rd for Wavetronix installation.
– a lane will be closed overnight Bluemound Rd EB/WB at Underwood Creek Pkwy, at 121st St, at 112th St and at 92nd St for Wavetronix installation.
 
HFST and Overlays Project
– lanes will be closed overnight I-41 NB/SB at Burleigh St for pavement markings.
 
Valley Bridges/ Marquette Interchange Project
– the Marquette Int E-N system ramp will be closed overnight for safety rail installation.
 
Monday (8/21)
Zoo Interchange Project
– the full closure on 100th St NB from Madison Pl to Washington Ave reopens to traffic by 6pm.
– a lane will be closed overnight STH 100 NB/SB at Wisconsin Ave, Potter Rd, and at Watertown Plank Rd for Wavetronix installation.
– a lane will be closed overnight Bluemound Rd EB/WB at Underwood Creek Pkwy, at 121st St, at 112th St and at 92nd St for Wavetronix installation.
– the Zoo Int S-W system ramp will be closed overnight for staining.
 
Highway Lighting Maintenance Project
– a lane will be closed during the day I-41/US 45 NB from Milwaukee-Waukesha Co Line to Main St for lighting work.
 
HFST and Overlays Project
– lanes will be closed overnight I-94 WB at the Stadium Interchange for pavement markings.
– the Stadium Int E-N system ramp will be closed overnight for pavement markings.
 
Valley Bridges/ Marquette Interchange Project
– a lane will be closed overnight Michigan St EB at 10th St for PPC overlay.
– there will be a full closure overnight Michigan St WB at 10th St for PPC overlay.
– the Marquette Int N-E system ramp will be closed overnight for deck preparation.
 
Waukesha Co Joint Repair Project
–  lanes will be closed overnight I-94 WB from CTH T to CTH SS for joint repair.
 
Tuesday (8/22)
Zoo Interchange Project
– a lane will be closed overnight STH 100 NB/SB at Wisconsin Ave, Potter Rd, and at Watertown Plank Rd for Wavetronix installation.
– a lane will be closed overnight Bluemound Rd EB/WB at Underwood Creek Pkwy, at 121st St, at 112th St and at 92nd St for Wavetronix installation.
– the Zoo Int S-W system ramp will be closed overnight for staining.
 
Highway Lighting Maintenance Project
– a lane will be closed during the day I-41/US 45 NB from Milwaukee-Waukesha Co Line to Main St for lighting work.
 
Valley Bridges/ Marquette Interchange Project
– a lane will be closed overnight Michigan St WB at 10th St for PPC overlay test.
– the Marquette Int N-E system ramp will be closed overnight for PPC overlay.
– the Marquette Int E-N system ramp will be closed overnight for milling.
 
Waukesha Co Joint Repair Project
– lanes will be closed overnight I-94 WB from CTH SS to Elmhurst Rd for joint repair.
 
Wednesday (8/23)
Zoo Interchange Project
– a lane will be closed overnight STH 100 NB/SB at Wisconsin Ave, Potter Rd, and at Watertown Plank Rd for Wavetronix installation.
– a lane will be closed overnight Bluemound Rd EB at Underwood Creek Pkwy, at 121st St, at 112th St and at 92nd St for Wavetronix installation.
– lanes will be closed overnight I-94 EB at Elm Grove Rd for barrier wall, crash cushion and equipment mobilization.     *contingency is Thursday 8/24
– there is a full closure overnight I-94 WB at the Zoo Interchange for decking/overhangs and traffic switch.     *contingency is Thursday 8/24
– the Zoo Int N-E system ramp will be closed overnight for decking/overhangs and traffic switch.     *contingency is Thursday 8/24
– the Zoo Int N-W system ramp will be closed overnight for decking/overhangs and traffic switch.   *contingency is Thursday 8/24
– the Zoo Int S-W system ramp will be closed overnight for staining and traffic switch.     *contingency is Thursday 8/24
 
Highway Lighting Maintenance Project
– a lane will be closed during the day I-41/US 45 NB from Milwaukee-Waukesha Co Line to Main St for lighting work.
 
Valley Bridges/ Marquette Interchange Project
– the Marquette Int E-N system ramp will be closed overnight for deck preparation.
– the Marquette Int N-E system ramp will be closed overnight for PPC overlay.
– a lane will be closed overnight on the Marquette Int W-N system ramp for milling.
 
Waukesha Co Joint Repair Project
– a lane will be closed overnight I-94 WB from CTH SS to STH 83 for joint repair.
 
Thursday (8/24)
Zoo Interchange Project
– a lane will be closed overnight STH 100 NB/SB at Wisconsin Ave, Potter Rd, and at Watertown Plank Rd for Wavetronix installation.
– a lane will be closed overnight Bluemound Rd EB at Underwood Creek Pkwy, at 121st St, at 112th St and at 92nd St for Wavetronix installation.
– there is a full closure overnight I-94 WB at the Zoo Interchange for decking/overhangs.    *contingency is Friday 8/25
– the Zoo Int N-E system ramp will be closed overnight for decking/overhang.         *contingency is Friday 8/25
– the Zoo Int N-W system ramp will be closed overnight for decking/overhangs.       *contingency is Friday 8/25
 
Meinecke St Bridge Project
– there will be a full closure overnight I-41 NB at Mayfair Rd for railing removal, lighting removal, and demo preparation.
 
Valley Bridges/ Marquette Interchange Project
– the Marquette Int E-N system ramp will be closed overnight for deck preparation.
– the Marquette Int N-E system ramp will be closed overnight for PPC overlay.
– a lane will be closed overnight on the Marquette Int W-N system ramp for milling.
 
Waukesha Co Joint Repair Project
– a lane will be closed overnight I-94 WB from STH 83 to CTH C for joint repair.
 
Friday (8/25)
Zoo Interchange Project
– a lane will be closed overnight STH 100 NB/SB at Wisconsin Ave, Potter Rd, and at Watertown Plank Rd for Wavetronix installation.
– a lane will be closed overnight Bluemound Rd EB at Underwood Creek Pkwy, at 121st St, at 112th St and at 92nd St for Wavetronix installation.
 
Meinecke St Bridge Project
– there will be a full closure overnight I-41 NB at Mayfair Rd for bridge removal.
 
Valley Bridges/ Marquette Interchange Project
– the Marquette Int N-E system ramp will be closed overnight for PPC overlay.
 
Waukesha Co Joint Repair Project
– a lane will be closed overnight I-94 WB from CTH C to CTH P for joint repair.
 
Saturday (8/26)
Zoo Interchange Project
– only long-term closures in effect.
 
Sunday (8/27)
Zoo Interchange Project
– only long-term closures in effect.
 
Valley Bridges/ Marquette Interchange Project
– the Marquette Int E-N system ramp will be closed overnight for PPC overlay.
– a lane will be closed overnight on the Marquette Int W-N system ramp for deck preparation.
Long-Term Closures
Zoo Interchange Project
– lanes will be closed North Ave WB under I-41 through late August 2017 for WE Energies utility work.
– there will be a full closure of the Bluemound Rd entrance ramp to I-41 SB through late August 2017 for ramp reconstruction.
– there will be a full closure Elm Grove Rd NB/SB at I-94 through late August 2017 for bridge reconstruction.
– there will be a full closure of the I-41 NB exit ramp to Capitol Dr through late August 2017 for intersection reconstruction.
– there will be a full closure of Capitol Dr entrance ramp to I-41 NB through late August 2017 for intersection reconstruction.
– there will be a full closure of the Capitol Dr EB/WB frontage road at I-41 through late August 2017 for intersection reconstruction (EB/WB access on Capitol Dr is maintained on the lower roadway).
– there will be a full closure of Fairview Ave EB/WB from 118th St to Curtis St through late Fall 2017 for retaining wall construction.
– there will be a full closure of Fairview Ave EB from 118th St to 116th St through late Fall 2017 for retaining wall construction (becomes one-way WB only).
– there will be a full closure of the Lincoln Ave entrance ramp to I-41/894 NB through early Fall 2017 for roadway construction.
– there will be a full closure of the Greenfield Avenue entrance ramp to I-41/894 SB through early Fall 2017 for roadway construction.
– a lane will be closed on Curtis Rd NB/SB under I-94 through Fall 2017 for roadway construction.
– there will be a full closure of the HWY 100 entrance ramp to I-94 WB through Fall 2017 for ramp reconstruction.
– there will be a full closure of the I-94 WB exit ramp to HWY 100 through Fall 2017 for ramp reconstruction.
– there will be a full closure from 100th St NB/SB from Orchard St to Maple St through Fall 2017 for roadway work.
– there will be a full closure of 100th St NB from Madison Pl to Washington St to 6pm Monday (8/21) for retaining wall construction (becomes one-way SB only).
– a lane will be closed Watertown Plank Rd EB/WB from HWY 100 to 115th St through mid-November 2017 for bridge reconstruction.
– a left-turn lane will be closed HWY 100 NB at Watertown Plank Rd through mid-November 2017 for bridge reconstruction.
– there will be a full closure of the Zoo Int E-S system ramp through late November 2017 for ramp reconstruction.
– there will be a full closure of the I-94 EB exit ramp to 84th St (from I-94 EB and I-41 SB) through late November 2017 for roadway reconstruction.
– there will be a full closure of the Greenfield Ave entrance ramp to I-41/894 NB (to I-41 NB and I-94 WB) through late 2017 for ramp reconstruction.
– there will be a full closure of the 84th St entrance ramp to I-94 WB (to I-94 WB) through late 2017 for roadway reconstruction.
– there will be a full closure of the Deer Creek Trail/Oak Leaf Trail NB/SB at I-94 through late 2017 for bridge reconstruction (one trail will remain open at all times).
– there will be a full closure of the I-41 NB exit ramp to Bluemound Rd through late April 2018 for ramp reconstruction.
– there will be a full closure of the I-41/894 SB exit ramp to Greenfield Ave through early Summer 2018 for roadway construction.
– there will be a full closure of the I-41/894 SB exit ramp to Lincoln Ave through early Summer 2018 for roadway construction.
– there will be a full closure of Schlinger Ave EB/WB under I-41/894 through late Summer 2018 for project construction.
– the Hank Aaron State Trail will be closed to pedestrians from 94th Pl to Oak Leaf Trail through late Summer 2018 for project construction.
 

Nor-X-Way Channel Project

– there will be a full closure long-term through early Winter 2017 of the I-41 NB exit ramp to Main St EB for reconstruction.
– there will be a full closure long-term through early Winter 2017 of the Main St entrance ramp to I-41 SB for reconstruction.