Zoo Interchange Project

Latest Traffic Report: 11/22/17

List of all scheduled closures and restrictions on the Zoo Interchange Project from November 22 – December 3:

Wednesday (11/22)

Zoo Interchange Project

– the lane closure on Watertown Plank Rd EB/WB from HWY 100 to 115th St reopens to traffic by 3pm.

– the left-turn lane closure on HWY 100 NB at Watertown Plank Rd reopens to traffic by 3pm.

– a lane will be closed overnight HWY 100 NB/SB from Mt. Vernon Ave to Wisconsin Ave for WisDOT lighting work.

– a lane will be closed overnight HWY 100 NB/SB from North Ave to Center St for WisDOT lighting work.

– a lane will be closed overnight HWY 100 SB from Dakota St to Wollmer Ave for WisDOT lighting work.

 

Thursday (11/23)

Zoo Interchange Project

– only long-term lane closures in effect.

 

Friday (11/24)

Zoo Interchange Project

– only long-term lane closures in effect.

 

Saturday (11/25)

Zoo Interchange Project

– only long-term lane closures in effect.

 

Sunday (11/26)

Zoo Interchange Project

– only long-term lane closures in effect.

 

Monday (11/27)

Zoo Interchange Project

– a lane will be closed during the day I-94 EB from 64th St to Mitchell Blvd for Milwaukee Co Maintenance guard rail repair.

– the Stadium Int W-N system ramp will be closed during the day for Milwaukee Co Maintenance pavement repair.

 

Tuesday (11/28)

Zoo Interchange Project

– lanes will be closed overnight I-94 WB at 70th St for sign structure work.   *contingency is Wednesday 11/29

– there will be a full closure overnight I-41 SB at Bluemound Rd for sign structure work.   *contingency is Wednesday 11/29

– the Zoo Int E-N system ramp will be closed overnight for sign structure work.

– the Zoo Int W-S system ramp will be closed overnight for sign structure work.

 

Wednesday (11/29)

Zoo Interchange Project

– there will be a full closure overnight I-41 SB at Bluemound Rd for sign structure work and a traffic switch.

– there will be a full closure overnight I-41/894 NB at Greenfield Ave for sign structure work.   *contingency is Thursday 11/30

– the Zoo Int W-S system ramp will be closed overnight for sign structure work.

 

Ryan Road Interchange Project

– lanes will be closed during the day Ryan Rd EB from 22nd St to 13th St for milling.

 

Thursday (11/30)

Zoo Interchange Project

– there will be a full closure overnight I-41 SB at Bluemound Rd for asphalt work.

– there will be a full closure overnight I-94 EB at Moorland Rd for traffic switch preparation.

 

Friday (12/1)

Zoo Interchange Project

– the National Ave entrance ramp to I-41/894 SB reopens to traffic by 5am.

– there will be a full closure overnight I-94 EB at Moorland Rd for a traffic switch.

 

Saturday (12/2)

Zoo Interchange Project

– there will be a full closure in the afternoon Greenfield Ave EB/WB from 84th St to 68th St for a City of West Allis holiday parade.

 

Sunday (12/3)

Zoo Interchange Project

– only long-term lane closures in effect.

 

Long-Term Closures

Zoo Interchange Project

– there will be a full closure of the National Ave entrance ramp to I-41/894 SB through 12/1 for roadway reconstruction.

– there will be a full closure 120th St NB/SB at Fairview Ave through early December 2017 for roadway reconstruction.

– there will be a full closure Fairview Ave EB/WB from 120th St to Curtis Rd through early December 2017 for roadway reconstruction.

– a lane will be closed on Curtis Rd NB/SB under I-94 through mid-December 2017 for roadway construction.

– there will be a full closure of the I-94 EB exit ramp to 84th St (from I-41 SB) through late December 2017 for roadway reconstruction.

– there will be a full closure of the 84th St entrance ramp to I-94 WB (to I-94 WB) through late 2017 for roadway reconstruction.

– there will be a full closure of the Deer Creek Trail/Oak Leaf Trail NB/SB at I-94 through late 2017 for bridge demolition (one trail will remain open at all times).

– there will be a full closure of the National Ave entrance ramp to I-41/894 NB through late 2017 for roadway reconstruction.

– there will be a full closure of the I-41 NB exit ramp to Bluemound Rd through late April 2018 for ramp reconstruction.

– there will be a full closure of the 84th St entrance ramp to I-94 WB (to I-41 NB) through early Summer 2018 for roadway reconstruction.

– there will be a full closure of the 84th St entrance ramp to I-94 WB (to I-41/894 SB) through early Summer 2018 for roadway reconstruction.

– there will be a full closure of the Greenfield Ave entrance ramp to I-41/894 NB (to I-41 NB) through early Summer 2018 for ramp reconstruction.

– there will be a full closure of the Greenfield Ave entrance ramp to I-41/894 NB (to I-94 WB) through early Summer 2018 for ramp reconstruction.

– there will be a full closure of the I-41/894 SB exit ramp to Greenfield Ave (from I-41 SB) through early Summer 2018 for roadway construction.

– there will be a full closure of the I-41/894 SB exit ramp to Greenfield Ave (from I-94 EB) through early Summer 2018 for roadway construction.

– there will be a full closure of the I-41/894 SB exit ramp to Greenfield Ave (from I-94 WB) through early Summer 2018 for roadway construction.

– there will be a full closure of the I-41/894 SB exit ramp to Lincoln Ave through early Summer 2018 for roadway construction.

– there will be a full closure of the Zoo Int E-S system ramp through June 2018 for ramp reconstruction.

– there will be a full closure of the I-94 EB exit ramp to 84th St (from I-94 EB) through Summer 2018 for roadway reconstruction.

– there will be a full closure of Schlinger Ave EB/WB under I-41/894 through late Summer 2018 for project construction.

– the Hank Aaron State Trail will be closed to pedestrians from 94th Pl to Oak Leaf Trail through late Summer 2018 for project construction.

 

Ryan Road Interchange Project

– a lane will be closed Ryan Rd EB/WB from 13th St to 22nd St through 12/11 for temporary signal work.

 

CTH K Crossroad Project

– a lane will be closed CTH K EB/WB from the I-94 SB ramps to the west frontage road through mid-December 2017 for roadway reconstruction.