{"id":12,"date":"2025-02-25T18:12:16","date_gmt":"2025-02-26T00:12:16","guid":{"rendered":"https:\/\/projects.511wi.gov\/wis91nepe\/full-project-overview\/"},"modified":"2025-10-10T14:14:02","modified_gmt":"2025-10-10T19:14:02","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/wis91nepe\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<p><strong><a href=\"http:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91map.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-38\" src=\"http:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91map.jpg\" alt=\"WIS 91 project work zone limits\" width=\"631\" height=\"446\" srcset=\"https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91map.jpg 921w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91map-300x212.jpg 300w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91map-768x543.jpg 768w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91map-631x446.jpg 631w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91map-500x353.jpg 500w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91map-120x85.jpg 120w\" sizes=\"auto, (max-width: 631px) 100vw, 631px\" \/><\/a><\/strong><\/p>\n<p><strong>PROJECT COMPLETE. WEBSITE FOR REFERENCE ONLY.<\/strong><\/p>\n<p><strong>Location<\/strong><\/p>\n<p>The project will take place on WIS 91 from the west Winnebago county line to just west of WIS 44 within the City of Oshkosh and the towns of Algoma, Nekimi, Utica, Rushford, and Nepeuskun.<\/p>\n<ul>\n<li><a href=\"http:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91map.pdf\">View project location on a map<\/a> (pdf)<\/li>\n<li><a href=\"https:\/\/projects.511wi.gov\/wis91nepe\/map\/\">View project on an interactive map<\/a><\/li>\n<\/ul>\n<p><strong>Project purpose and need<\/strong><br \/>\nThe purpose of this project is to address deteriorating pavement and failing drainage structures on WIS 91. Multiple culverts are in need of replacement before a failure could affect drainage along the roadway or affect the integrity of the roadway.<\/p>\n<p><strong>Project improvements<\/strong><\/p>\n<p>This is a resurfacing-level project. Project improvements include:<\/p>\n<ul>\n<li>Mill the existing asphalt pavement\/overlay with new asphalt pavement<\/li>\n<li>Shoulder work &#8211; including increasing the paved shoulder width from 3 feet to 5 feet<\/li>\n<li>Replacement of roughly 30 pipe culverts throughout project limits\n<ul>\n<li>A roughly six-week detour will be needed to replace culvert pipes.<\/li>\n<\/ul>\n<\/li>\n<li>Centerline and shoulder rumble strips will be installed<\/li>\n<li>Pavement markings<\/li>\n<li>Installation of storm sewer system between Morrow Road and Archery Drive.<\/li>\n<\/ul>\n<p><a href=\"http:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/detour.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-42\" src=\"http:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/detour-1024x819.png\" alt=\"\" width=\"298\" height=\"238\" srcset=\"https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/detour-1024x819.png 1024w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/detour-300x240.png 300w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/detour-768x614.png 768w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/detour-558x446.png 558w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/detour-500x400.png 500w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/detour-106x85.png 106w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/detour.png 1280w\" sizes=\"auto, (max-width: 298px) 100vw, 298px\" \/><\/a><strong>Anticipated benefits<\/strong><\/p>\n<p>Providing motorists with a new surface will improve the smoothness of ride for drivers and help to minimize wear on their vehicles. An extension of the pavement life will\u00a0lead to a decrease in future maintenance costs of the roadway as well. Culvert replacements will assist in the efficient transport of water and help to avoid flooding in the event of a significant rainfall event. Rumble strips, wider paved shoulders, and new pavement markings will create a safer passage for motorists.<\/p>\n<p><strong>Project schedule<\/strong><\/p>\n<ul>\n<li>Construction Start \u2013 Tuesday, May 27, 2025\n<ul>\n<li>All culvert work completed first followed by milling\/asphalt paving<\/li>\n<li>Work Suspension during EAA AirVenture: Noon, Sunday, July 20 \u2013 6 a.m. Monday, July 28<\/li>\n<\/ul>\n<\/li>\n<li>Construction Completion \u2013 Expected by October 1, 2025<\/li>\n<\/ul>\n<p><strong><a href=\"http:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91detour.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-37\" src=\"http:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91detour.jpg\" alt=\"WIS 91 detour route WIS 44 and County MM\" width=\"465\" height=\"359\" srcset=\"https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91detour.jpg 780w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91detour-300x232.jpg 300w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91detour-768x594.jpg 768w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91detour-577x446.jpg 577w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91detour-500x387.jpg 500w, https:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91detour-110x85.jpg 110w\" sizes=\"auto, (max-width: 465px) 100vw, 465px\" \/><\/a>Traffic impacts<\/strong><\/p>\n<p>WIS 91 will be closed and detoured during the beginning of the project. Lane closures and flagging operations will also occur. WIS 91 will be open during EAA AirVenture.<\/p>\n<ul>\n<li>Access for emergency responders, property owners, and businesses will be maintained at all times.<\/li>\n<li>WisDOT state highway detours are created to limit heavy semi-trucks and equipment on local roadways.\n<ul>\n<li>Local traffic may find a shorter route than the state highway detour using the local road system.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>Traffic impacts along the WIS 91 corridor are as follows:<\/p>\n<ul>\n<li><strong>May 27 to early July 2025<\/strong>\n<ul>\n<li>WIS 91 will be <strong>CLOSED AND DETOURED<\/strong> between WIS 116\/County M and WIS 44.\n<ul>\n<li>Detour will follow County M to WIS 44<\/li>\n<li><a href=\"http:\/\/projects.511wi.gov\/wis91nepe\/wp-content\/uploads\/sites\/1379\/91detour.pdf\">View detour route in a map<\/a> (pdf)<\/li>\n<\/ul>\n<\/li>\n<li>WIS 91 will remain open west of WIS 116\/County M with flagging operations.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Early July to end of project<\/strong>\n<ul>\n<li>WIS 91 will remain open to traffic throughout the corridor with flagging operations<\/li>\n<li>Minor delays can be expected during flagging operations. Please pay attention to directions and signage in the work zone.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><strong>Temporary Business Signing and Business Resources<\/strong><\/p>\n<p>Temporary business signing may be placed during the detoured portion of the project by filling out a WisDOT business signing permit. All temporary business signing needs approval via the permit before placement to ensure it is in a safe location and does not pose a visual distraction or traffic hazard.<\/p>\n<p>The temporary business signing permit is free. Costs associated with creating the temporary sign are the responsibility of the business. The permit is available as a fillable-form WORD document or pdf below, or you can request one from the project contacts below.<\/p>\n<ul>\n<li>Click the below link for instructions and a link to a fillable-form WORD application for the temporary business signing permit.\n<ul>\n<li><a href=\"https:\/\/wisconsindot.gov\/Documents\/projects\/in-together\/temporary-signage.pdf\">Download Temporary Business Sign Instructions and Permit<span style=\"text-decoration: underline\">\u00a0<\/span><\/a><\/li>\n<li>Please email or mail the free permit to any of the contacts below.<\/li>\n<\/ul>\n<\/li>\n<li>For more information regarding temporary signing, plus tips and tools for businesses impacted by highway construction, please visit\u00a0<a href=\"https:\/\/wisconsindot.gov\/Pages\/projects\/in-together\/default.aspx\">WisDOT\u2019s In This Together business resource website<\/a>.<\/li>\n<\/ul>\n<p><strong>Project contacts<\/strong><\/p>\n<p>The project will have an onsite construction office and an onsite construction manager. For all construction questions while work is taking place, please call or email the construction project manager or arrange a time to come to the construction office.<\/p>\n<p>Brian Heiden, P.E., onsite construction manager<br \/>\nLocation of construction office &#8211; TBA<br \/>\n(920) 366-3743;\u00a0Email <a href=\"mailto:Brian.Heiden@dot.wi.gov\">Brian.Heiden@dot.wi.gov<\/a><\/p>\n<p>For any other questions, please contact the WisDOT Project Manager.<\/p>\n<p>Bill Bertrand, P.E.<br \/>\nWisconsin Department of Transportation<br \/>\nNortheast Region<br \/>\n944 Vanderperren Way<br \/>\nGreen Bay, WI 54304<br \/>\nPhone: 920-360-3124<br \/>\nEmail:<a href=\"mailto:William.Bertrand@dot.wi.gov\"> William.Bertrand@dot.wi.gov<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p><strong>PROJECT COMPLETE. WEBSITE FOR REFERENCE ONLY. <\/strong>WIS 91 improvements in Winnebago County will begin May 27, 2025. Work is taking place from the West County Line in the town of Nepeuskun to WIS 44 in the city of Oshkosh.\u00a0 Improvements include milling\/resurfacing of WIS 91, replacement of roughly 30 pipe culverts, minor drainage improvements, and pavement marking. WIS 91 will be closed and detoured in portions of the work zone at the beginning of the project. The project is expected to finish by October 2025.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/wis91nepe\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/wis91nepe\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/wis91nepe\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis91nepe\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis91nepe\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":6,"href":"https:\/\/projects.511wi.gov\/wis91nepe\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":53,"href":"https:\/\/projects.511wi.gov\/wis91nepe\/wp-json\/wp\/v2\/posts\/12\/revisions\/53"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/wis91nepe\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis91nepe\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis91nepe\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}