Overview
This project is 16 miles in length, begins at intersection WIS 21/ 80 and ends at County Line Road. The rural portion of the project will be resurfaced (milling 2-inches of the existing pavement and paving 4-inches of asphaltic pavement).
- Construction schedule: June 5, 2023
This project is 16 miles in length, begins at intersection WIS 21/ 80 and ends at County Line Road. The rural portion of the project will be resurfaced (milling 2-inches of the existing pavement and paving 4-inches of asphaltic pavement).
- Construction schedule: June 5, 2023