Overview
This is a Highway Safety Improvement Project to address traffic safety and operations along 0.6 miles of WIS 80 in Necedah. The project is designed to widen the east side of the roadway to construct left-turn lanes.
- Construction schedule: March 2023 - 2023
This is a Highway Safety Improvement Project to address traffic safety and operations along 0.6 miles of WIS 80 in Necedah. The project is designed to widen the east side of the roadway to construct left-turn lanes.
- Construction schedule: March 2023 - 2023