Overview
The Wisconsin Department of Transportation (WisDOT) will resurface WIS 78, the 6.5 mile project is located between the Village of Gratiot and the Town of Wiota. Proposed improvements include resurfacing WIS 78 pavement, updating curb ramps in the Town of Wiota, and replacing the existing pavement markings.
- Construction schedule: April 24 - July 2023
The Wisconsin Department of Transportation (WisDOT) will resurface WIS 78, the 6.5 mile project is located between the Village of Gratiot and the Town of Wiota. Proposed improvements include resurfacing WIS 78 pavement, updating curb ramps in the Town of Wiota, and replacing the existing pavement markings.
- Construction schedule: April 24 - July 2023