{"id":12,"date":"2025-06-10T09:16:12","date_gmt":"2025-06-10T14:16:12","guid":{"rendered":"https:\/\/projects.511wi.gov\/wis76larson\/full-project-overview\/"},"modified":"2025-10-10T14:14:24","modified_gmt":"2025-10-10T19:14:24","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/wis76larson\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-38 alignright\" src=\"http:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsonmap.jpg\" alt=\"\" width=\"701\" height=\"469\" srcset=\"https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsonmap.jpg 735w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsonmap-300x201.jpg 300w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsonmap-666x446.jpg 666w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsonmap-500x335.jpg 500w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsonmap-127x85.jpg 127w\" sizes=\"auto, (max-width: 701px) 100vw, 701px\" \/><strong>PROJECT COMPLTED. WEBSITE FOR REFERENCE ONLY.<\/strong><\/p>\n<p><strong>WIS 76 is open to traffic as of Thursday, September 25, 2025.<\/strong><\/p>\n<p>The Wisconsin Department of Transportation (WisDOT) Northeast Region is constructing a roundabout at the intersection WIS 76 and Larsen Road intersection in Winnebago County. The purpose of this website is to provide information about the upcoming construction scope, schedule, traffic impacts, business resources, and project contacts.<\/p>\n<p><strong>Project location<\/strong><br \/>\nThis project will take place at the intersection of WIS 76 and Larsen Road, 2.2 miles south of US 10, in the town of Clayton, Winnebago County.<\/p>\n<ul>\n<li><a href=\"https:\/\/projects.511wi.gov\/wis76larson\/map\/\">View location on interactive map<\/a><\/li>\n<\/ul>\n<p><strong>Project purpose and need<\/strong><br \/>\nThe purpose of the project is to improve safety at the intersection of WIS 76 and Larsen Road while providing acceptable traffic operations. The need for the proposed improvement is to reduce the number and severity of crashes at the intersection, particularly right-angle type crashes, and to improve the traffic operations of the intersection.<\/p>\n<ul>\n<li>The intersection of WIS 76 and Larsen Road had sixteen crashes from 2016 to 2020, resulting in one fatal crash and nine injury type crashes.<\/li>\n<li>Of the sixteen crashes, twelve were right angle crashes.<\/li>\n<li>In addition, the new Neenah High School located approximately 1-mile east of the intersection is expected to increase traffic at the intersection.<\/li>\n<\/ul>\n<p><strong>Project improvements<\/strong><\/p>\n<p>WisDOT will construct a single lane roundabout at the WIS 76\/Larsen Road intersection. Construction includes new pavement structure, new pavement markings and signing, culvert and storm sewer installation, and intersection lighting.<\/p>\n<ul>\n<li><a href=\"http:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsenrab.pdf\">View design display of new WIS 76\/Larsen Road Roundabout<\/a> (pdf)<\/li>\n<\/ul>\n<p><strong>Anticipated benefits<\/strong><\/p>\n<p>This project will improve traffic safety by reducing number of right-angle crashes, improving intersection operational efficiency, providing smoother driving lanes for motorists, improve intersection drainage, and decrease future maintenance costs<\/p>\n<p><strong>Traffic impacts<img loading=\"lazy\" decoding=\"async\" class=\" wp-image-35 alignright\" src=\"http:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsendetour-1024x724.jpg\" alt=\"\" width=\"589\" height=\"417\" srcset=\"https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsendetour-1024x724.jpg 1024w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsendetour-300x212.jpg 300w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsendetour-768x543.jpg 768w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsendetour-1536x1086.jpg 1536w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsendetour-2048x1447.jpg 2048w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsendetour-631x446.jpg 631w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsendetour-500x353.jpg 500w, https:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsendetour-120x85.jpg 120w\" sizes=\"auto, (max-width: 589px) 100vw, 589px\" \/><\/strong><\/p>\n<p>The WIS 76\/Larsen Road intersection is now OPEN to traffic.<\/p>\n<p><strong>Temporary Business Signing<\/strong><\/p>\n<p>Temporary business signing may be placed during the detoured portion of the project by filling out a WisDOT temporary business signing permit. The permit is free. All temporary business signing needs approval via the permit before placement to ensure it is in a safe location and do not pose a visual distraction or traffic hazard. Costs associated with creating the temporary signing are the responsibility of the business.<\/p>\n<ul>\n<li>Please keep the following items in mind regarding business signing:<\/li>\n<li>Temporary business signings cannot be placed on traffic control devices or state signs.<\/li>\n<li>WisDOT encourages businesses to team up and have multiple businesses listed on one sign structure versus several individual signs. This makes it easier for travelers to identify signs and find their destination.<\/li>\n<\/ul>\n<p>Temporary Business Sign permits are available as a fillable-form WORD document on the Business Resource website. You can also request one from the contacts below.<\/p>\n<ul>\n<li><a href=\"https:\/\/wisconsindot.gov\/Documents\/projects\/in-together\/temporary-signage.pdf#\">Go to the Temporary Business Sign Permit instruction and application webpage.<\/a>\n<ul>\n<li>Includes instructions and application for download.<\/li>\n<\/ul>\n<\/li>\n<li>Please email the completed permit to Bill Bertrand, or if you prefer to mail the completed form, please address to Bill Bertrand, WisDOT NE Region, 944 Vanderperren Way, Green Bay, WI 54304.<\/li>\n<\/ul>\n<p><strong>WisDOT Resources for Businesses<\/strong><br \/>\nWisDOT recognizes businesses located in work zones have special needs. While signing and other marketing\/advertising during the construction is up to the business, WisDOT has business resources available through its \u201cIn This Together\u201d website to assist businesses with planning for construction closures and minimizing the impact of construction.<\/p>\n<ul>\n<li>For more information, <a href=\"https:\/\/wisconsindot.gov\/Pages\/projects\/in-together\/default.aspx\">please visit WisDOT&#8217;s In This Together website.<\/a><\/li>\n<\/ul>\n<p><strong>More information<\/strong><\/p>\n<ul>\n<li>Please see the <a href=\"https:\/\/projects.511wi.gov\/weeklyupdates-ne\/\">Northeast Region Weekly Construction Update<\/a> for a two-week preview of construction operations, traffic impacts, and schedule.<\/li>\n<li>WisDOT created a public construction handout for this project. Please download and print for anyone without access to this internet page.\n<ul>\n<li><a href=\"http:\/\/projects.511wi.gov\/wis76larson\/wp-content\/uploads\/sites\/1425\/76larsenho.pdf\">Download WIS 76\/Larsen Road Intersection Public Construction Handout<\/a> (pdf)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><strong>Project contacts<\/strong><\/p>\n<p>The project will have an onsite construction office and an onsite construction manager. For all construction questions while work is taking place, please call or email the construction project manager or arrange a time to come to the construction office.<\/p>\n<p>Brian Heiden, P.E.<br \/>\nLocation of construction office &#8211; TBA<br \/>\nPhone: (920) 366-3743<br \/>\nEmail: <a href=\"mailto:Brian.Heiden@dot.wi.gov\">Brian.Heiden@dot.wi.gov\u00a0<\/a><\/p>\n<p>For any other questions, please contact the WisDOT Project Manager.<\/p>\n<p>Bill Bertrand, P.E.<br \/>\nWisconsin Department of Transportation<br \/>\nNortheast Region<br \/>\n944 Vanderperren Way<br \/>\nGreen Bay, WI 54304<br \/>\nPhone: 920-360-3124<br \/>\nEmail: <a href=\"mailto:William.Bertrand@dot.wi.gov\">William.Bertrand@dot.wi.gov<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p><strong>PROJECT COMPLETE. WEBSITE FOR REFERENCE ONLY. <\/strong>The Wisconsin Department of Transportation is constructing a roundabout at the intersection WIS 76 and Larsen Road intersection in the town of Clayton, Winnebago County. Work begins June 30 with a full closure of the intersection beginning July 7 for the remainder of the project. WIS 76\/Larsen Road OPENED to traffic on Thursday, September 25, 2025.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/wis76larson\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/wis76larson\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/wis76larson\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis76larson\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis76larson\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":6,"href":"https:\/\/projects.511wi.gov\/wis76larson\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":66,"href":"https:\/\/projects.511wi.gov\/wis76larson\/wp-json\/wp\/v2\/posts\/12\/revisions\/66"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/wis76larson\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis76larson\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis76larson\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}