{"id":12,"date":"2023-02-20T15:51:53","date_gmt":"2023-02-20T21:51:53","guid":{"rendered":"https:\/\/projects.511wi.gov\/wis76cirshioc\/full-project-overview\/"},"modified":"2026-03-04T13:10:40","modified_gmt":"2026-03-04T19:10:40","slug":"full-project-overview","status":"publish","type":"post","link":"https:\/\/projects.511wi.gov\/wis76cirshioc\/full-project-overview\/","title":{"rendered":"Project Overview"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-115 alignright\" src=\"http:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76map2.png\" alt=\"WIS 76 location map\" width=\"392\" height=\"507\" srcset=\"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76map2.png 741w, https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76map2-232x300.png 232w, https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76map2-344x446.png 344w, https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76map2-500x648.png 500w, https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76map2-66x85.png 66w\" sizes=\"auto, (max-width: 392px) 100vw, 392px\" \/>The Wisconsin Department of Transportation will reconstruct approximately 1.5 miles of roadway through the village of Greenville and town of Ellington beginning March 9, 2026.<\/p>\n<p><strong>Read News Release:<\/strong> <a href=\"http:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76start.pdf\">Construction Begins March 9, 2026<\/a><\/p>\n<p><strong>Read News Release:<\/strong> <a href=\"http:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76cim26.pdf\">WisDOT to hold WIS 76 Construction Information Meeting<\/a><\/p>\n<p><strong>Project Location<\/strong><br \/>\nWIS 76 from Everglade Road to the County JJ intersection in the village of Greenville and town of Ellington, Outagamie County.<\/p>\n<ul>\n<li><a href=\"http:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76map511.pdf\">WIS 76 Project Location Map<\/a>\u00a0(pdf)<\/li>\n<\/ul>\n<p><strong>Project need<\/strong><br \/>\nThe purpose of the project is to improve operation, safety and accessibility along the roadway for vehicles, bicycles, and pedestrians due to development within the areas. The project will also serve to replace the deteriorating pavement structure.<\/p>\n<p><strong>Project improvements\u00a0<\/strong><\/p>\n<p>WisDOT will reconstruct approximately 1.5 miles of roadway through the village of Greenville and town of Ellington. Construction elements include:<\/p>\n<ul>\n<li>Reconstruction of roadway from rural roadway to urban with curb and gutter<\/li>\n<li>New roundabout at WIS 76\/County JJ intersection<\/li>\n<li>Pedestrian accommodations on WIS 76:\n<ul>\n<li>West side: 6\u2019 terrace, 5\u2019 sidewalk<\/li>\n<li>East side: 6\u2019terrace, 5\u2019 sidewalk from Everglade to Hummock<\/li>\n<\/ul>\n<\/li>\n<li>Speed limit change from 45 mph to 35 mph<\/li>\n<li>Signing and pavement marking<\/li>\n<li>Stormwater improvements at Glen Valley Pond<\/li>\n<li>New stormwater pond near Hillview Drive<\/li>\n<li>New storm sewer and lighting<\/li>\n<li><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-100 alignright\" src=\"http:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76rab2023.png\" alt=\"Roundabout exhibit\" width=\"333\" height=\"239\" srcset=\"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76rab2023.png 1007w, https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76rab2023-300x215.png 300w, https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76rab2023-768x551.png 768w, https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76rab2023-621x446.png 621w, https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76rab2023-500x359.png 500w, https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76rab2023-118x85.png 118w\" sizes=\"auto, (max-width: 333px) 100vw, 333px\" \/><a href=\"http:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76construction.pdf\">View the WIS 76 Project Improvement exhibit<\/a> (pdf)<\/li>\n<\/ul>\n<p><strong>Schedule<\/strong><\/p>\n<p>Construction currently scheduled to begin March 9, 2026, and finish in fall of 2026.<\/p>\n<p><strong>Traffic impacts<\/strong><br \/>\nWIS 76 will be <strong>closed and detoured<\/strong> to through traffic in two stages. Access to property owners and businesses within the work zone will be maintained at all times.<\/p>\n<ul>\n<li><a href=\"http:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/76detours.pdf\">View Stage 1 and Stage 2 detour routes on a map<\/a><\/li>\n<\/ul>\n<p><strong>First stage closure: <\/strong>March 9, 2026 to November 2026.<\/p>\n<ul>\n<li>WIS 76 between Everglade Road to County JJ will be closed beginning March 9.\n<ul>\n<li>Detour: WIS 15 to County JJ to WIS 76.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><strong>Second stage closure:<\/strong> WIS 76\/County JJ intersection in early June to November. This closure is to create the new roundabout intersection.<\/p>\n<ul>\n<li>WIS 76 and County JJ intersection will close in June, and the Stage 1 detour will change to below route.\n<ul>\n<li>Detour: WIS 15 to County JJ to County M to County S to WIS 76.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><strong><a href=\"http:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/bizpic.jpg\" target=\"_blank\" rel=\"https:\/\/wisconsindot.gov\/Pages\/projects\/in-together\/default.aspx noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-42\" src=\"http:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/bizpic.jpg\" alt=\"\" width=\"266\" height=\"226\" srcset=\"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/bizpic.jpg 300w, https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-content\/uploads\/sites\/1025\/bizpic-100x85.jpg 100w\" sizes=\"auto, (max-width: 266px) 100vw, 266px\" \/><\/a>Temporary business signing and business resources<\/strong><\/p>\n<p>Temporary business signing may be placed during the detoured portion of the project by filling out a WisDOT business signing permit. All temporary business signing needs approval via the permit before placement to ensure it is in a safe location and does not pose a visual distraction or traffic hazard. The temporary business signing permit is free. Costs associated with creating the temporary sign are the responsibility of the business. The permit is available as a fillable-form WORD document at the webpage below:<\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li><a href=\"https:\/\/wisconsindot.gov\/Pages\/projects\/in-together\/workbook\/temporary-signage-guide.aspx\">Go to Temporary Business Signing Guide and Application webpage\u00a0<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>For more information regarding temporary signing, plus tips and tools for businesses impacted by highway construction, please visit WisDOT\u2019s &#8220;In This Together&#8221; business resource website. The In This Together program is offered to business and community leaders as an idea source as they plan for road construction in their area.<\/p>\n<ul>\n<li><a href=\"https:\/\/wisconsindot.gov\/Pages\/projects\/in-together\/default.aspx\">Visit WisDOT&#8217;s In This Together Website<\/a><\/li>\n<\/ul>\n<p><strong>Project contacts<\/strong><\/p>\n<p><strong>Onsite Project Construction Lead <\/strong>&#8211; Please contact the construction leader with all construction-related question.<\/p>\n<p>Ryan Trzinski<br \/>\nPhone: 920-662-9641<br \/>\nEmail: <a href=\"mailto:rtrzinski@releeinc.com\">rtrzinski@releeinc.com\u00a0<\/a><\/p>\n<p><strong>Onsite Project Field Office<\/strong><\/p>\n<p>The field office is located in the southwest corner of the WIS 76\/WIS 15 intersection in Greenville.<\/p>\n<ul>\n<li><span data-teams=\"true\">Address: N1594 Meadow Park Drive, Greenville, WI\u00a0 54942<\/span><\/li>\n<\/ul>\n<p><strong>WisDOT Project contact<\/strong><\/p>\n<p>Jesse Hansen, P.E., Project Manager, WisDOT, Northeast Region<br \/>\n944 Vanderperren Way<br \/>\nGreen Bay, WI 54304-5344<br \/>\nPhone: (920) 492-5630<br \/>\n<a href=\"mailto:jesse.hansen@dot.wi.gov\">jesse.hansen@dot.wi.gov<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WisDOT will reconstruct approximately 1.5 miles of WIS 76 through the village of Greenville and town of Ellington in Outagamie County, including a new roundabout intersection at WIS 76 and County Road JJ. Work begins March 9, 2026. This project includes full highway closures and detours.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-json\/wp\/v2\/posts\/12","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-json\/wp\/v2\/comments?post=12"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-json\/wp\/v2\/posts\/12\/revisions"}],"predecessor-version":[{"id":147,"href":"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-json\/wp\/v2\/posts\/12\/revisions\/147"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-json\/wp\/v2\/media?parent=12"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-json\/wp\/v2\/categories?post=12"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis76cirshioc\/wp-json\/wp\/v2\/tags?post=12"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}