WIS 67 (Summit Ave.), US 18-County DR

Village of Summit, Waukesha County

Project Overview

PROJECT LOCATION

WIS 67 (Summit Ave.) from US 18 to County DR (Delafield Road) – Village of Summit

PURPOSE AND NEED

WIS 67 from US 18 to County DR is in need of resurfacing. The project includes pavement updates, safety improvements, bridge parapet work over the Bark RiverĀ and signal improvements at the intersection of US 18 and WIS 67.

SCHEDULE

Late February to June 2017

TRAFFIC IMPACTS

During the bridge work operations, traffic will be restricted to a one-way single lane configuration. Also, to implement these bridge operations safely, access to WIS 67 from Whitaker Lane will be closed temporarily.