Overview
The WIS 33/County I project will reconstruct the existing two-way stop controlled intersection with a modern single-lane roundabout.
- Construction begins Late June 2022
The WIS 33/County I project will reconstruct the existing two-way stop controlled intersection with a modern single-lane roundabout.
- Construction begins Late June 2022