{"id":9,"date":"2024-02-29T12:39:17","date_gmt":"2024-02-29T18:39:17","guid":{"rendered":"https:\/\/projects.511wi.gov\/i94lcbridge\/closures\/"},"modified":"2026-08-18T15:54:40","modified_gmt":"2026-08-18T20:54:40","slug":"trafficimpacts","status":"publish","type":"page","link":"https:\/\/projects.511wi.gov\/wis29redcedarriver\/trafficimpacts\/","title":{"rendered":"Traffic Impacts"},"content":{"rendered":"<p>During construction:<\/p>\n<ul>\n<li>WIS 29 will remain open to traffic, but motorists will encounter single-lane closures on the bridge controlled by temporary traffic signals.<\/li>\n<li>On the west side of the bridge, Riverside Park Road and the Red Cedar State and Stokke trails will remain open, but Riverside Park Road will be restricted to a single lane.\n<ul>\n<li>Traffic on the road and trails will be controlled by temporary signals.<\/li>\n<\/ul>\n<\/li>\n<li>On the east side of the bridge, Riverside Drive and River Road will be closed at WIS 29.\n<ul>\n<li>River Road traffic will be detoured via Wilson Avenue West and 2nd Street West.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>During construction: WIS 29 will remain open to traffic, but motorists will encounter single-lane closures on the bridge controlled by temporary traffic signals. On the west side of the bridge, Riverside Park Road and the Red Cedar State and Stokke trails will remain open, but Riverside Park Road will be restricted to a single lane. [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-layout-default.php","meta":{"_exactmetrics_skip_tracking":false,"footnotes":""},"class_list":["post-9","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/projects.511wi.gov\/wis29redcedarriver\/wp-json\/wp\/v2\/pages\/9","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projects.511wi.gov\/wis29redcedarriver\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.511wi.gov\/wis29redcedarriver\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis29redcedarriver\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.511wi.gov\/wis29redcedarriver\/wp-json\/wp\/v2\/comments?post=9"}],"version-history":[{"count":5,"href":"https:\/\/projects.511wi.gov\/wis29redcedarriver\/wp-json\/wp\/v2\/pages\/9\/revisions"}],"predecessor-version":[{"id":85,"href":"https:\/\/projects.511wi.gov\/wis29redcedarriver\/wp-json\/wp\/v2\/pages\/9\/revisions\/85"}],"wp:attachment":[{"href":"https:\/\/projects.511wi.gov\/wis29redcedarriver\/wp-json\/wp\/v2\/media?parent=9"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}