  • April 16 – October 2018 – Construction scheduled

Weekly construction update

Work completed this week (July9th¬†–¬†June 13th):

  • Asphalt pavement was removed from County I.
  • Recycled pavement was crushed and turned into base.
  • Storm sewer was installed.
  • The contractor continued work on the following:
    • Constructing the roundabout subgrade (crushed rock layer constructed before paving can be begin).
    • Placing grid fabric and crushed limestone to construct subgrade, which is the layer directly below the pavement.

Work anticipated to be completed next week pending weather:

  • The contractor will continue constructing the roundabout subgrade.
  • Work on storm sewer installations and placing base material will also continue.
  • Concrete sidewalk and curb will start to be poured next week weather pending.

Safety:

  • Please put down your phones, slow down, and drive with caution through all work zones!
  • Read some work zone safety tips, and do your part to “Be Alert, and Be Safe” in work zones!